Sir Robert McAlpine – Dunard Centre

Contract Period: 36 Months Region: Scotland Project: Dunard Centre

The development of a new music and performing arts centre is a £75 million project that will consist of a 1000 capacity centre in the heart of Edinburgh, the biggest to be built since the Usher Hall in 1914.

The project is set to last 36 months meaning Sir Robert McAlpine required a system they could trust and would stand the test of time. The system of choice was our Greensteel with Graphic Application.

Fast Fence has Supplied 74.8M of Greensteel Hoarding with graphics to Sir Robert McAlpine along with 3 x Vehicle Gates and 1 x Pedestrian Door.

Greensteel is manufactured from the highest quality, environmentally friendly materials ensuring a durable and sustainable product to secure your site. Offering a closed loop system our steel hoarding is 100% reusable and recyclable.

IMPACT Scotland is the charity responsible for the construction and operation of the Dunard Centre. Fast Fence worked closely with IMPACT Scotland to make sure that the graphics matched the vision they wanted to create.

Fast Fence were helpful and responsive to our needs – they put up with quite a lot of design changes to accommodate a host of unexpected challenges around our site. They displayed great patience, taking pains to remedy problems or find solutions to unforeseen changes as they arose.

Amanda Barry

IMPACT Scotland

External Hoarding at The Dunard Centre
Site Hoarding with Graphics at the Dunard Centre
Greensteel Hoarding with Graphic Application at The Dunard Centre
If you have any upcoming projects and would like us to provide a quote or require any further information, please feel free to contact us.

1 + 2 =

Accreditation logo