Art Gallery - Manchester

03 Dec 2012

Art Gallery – Manchester

Materials Supplied:

  • 266 metres of 2.4m High Greenhoard consisting of our In-ground fixing method.
  • 40 metres of 2.4m High Stormwall Steel Hoarding consisting of our In-ground fixing method.
  • 2no 5.0m wide double leaf vehicle gates and 2no 1.2m single leaf pedestrian gates.

Project Details:

A main contractor specified our Standard Steel Hoarding and Greenhoard as the most suitable hoarding solution due to it being quick to erect, secure, environmentally friendly and with no maintenance required therefore delivering a secure hassle free perimeter for a busy pedstrianised area.