Shopping Centre Development Wandsworth

10 Apr 2012

Shopping Centre - Wandsworth


Materials Supplied:

  • 80 metres of 2.0m High Standard Steel Hoarding consisting of a mix between Portable and In-ground fixing methods to meet the site requirements.
  • 1no 5.0m wide double leaf vehicle gates and 1no 1.2m single leaf pedestrian gate.

Project Details:


A main contractor specified our Standard Steel Hoarding as the most suitable hoarding solution due to it being quick to erect, secure and with no maintenance required therefore delivering a secure hassle free perimeter for a busy Shopping Centre.