Project:
Dogpool Lane, Birmingham Case Study
Client:
GMI Construction Group
System:
Greensteel™ hoarding
Details:
As part of the £24 million pound project to demolish the current buildings and then the construction of a purpose-built student accommodation scheme, comprising of 167 student bedroom spaces.
Fast Fence supplied and installed over 100m of Greensteel™ sustainable hoarding in the first phase alone. This is where this system comes into its own, as it has been designed with phasing at the forefront. The durable panels can be dismantled and reinstalled repeatedly; the Portable Blocklocker trays are also complete with telehandler pockets for ease when relocating.
We also had great feedback from GMI, the Project Manager on this project rated our system a 5 out of 5 and would recommend our system to others.