Case Study: Manchester Arena, Coop Live

Project:
Manchester Arena, Co-Op Live
System:
2.4m High Greensteel™ hoarding with Graphics
Details:

Fast Fence was appointed to supply and install 868m of our GreenSteel® system at the Co-op Live project. The site needed to be quickly secured with a pre-painted, no-dig solution; later graphics were applied to key elevations to promote the project.

Due to the heavy footfall at the arena, our engineers calculated crowd loading and applied this to the temporary works design.

As more and more companies are looking to construct responsibly our GreenSteel® system is the perfect choice. Being manufactured from recycled steel that is 100% reusable & recyclable makes it a closed loop sustainable hoarding solution.