Project:
Smithfield, Manchester
Client:
Galliford Try
System:
Greensteel™ hoarding
Details:
A challenging site with space restrictions requiring hoarding to have minimum encroachment and not disturb the ground. Our Blocklocker™ fixing system was perfect for this project, surface mounted and taking up only 600mm of space.
Feedback:
The team were delighted with the feedback from site